Which was the first route of Delhi Metro?

The Red Line
History. The Red Line was the first line of the Delhi Metro to be constructed and opened. The Tis Hazari-Shahdara section of the line was inaugurated by the then Prime Minister of India, Shri. Atal Bihari Vajpayee, on 25 December 2002 and opened to the public on the same day.

What is Delhi Metro phase4?

NEW DELHI: Delhi Metro Rail Corporation (DMRC) is all set to scale new heights with its Phase-IV expansion, literally. The under-construction Janakpuri West-RK Ashram Marg corridor will boast of not only Delhi Metro’s, but one of the world’s tallest stations at Haiderpur Badli.

How many phases are there in Delhi Metro?

The development of the network was divided into phases. Phase I with 3 lines was completed by 2006, and Phase II in 2011. As of March 2020, Phase III is in the finishing stage and scheduled to be mostly complete by the end of the year. Construction on Phase IV was formally started on 30 December 2019.

Which route started in Pune Metro?

2019 Dec: Commenced the first metro train trial run on Sant Tukaram Nagar-Phugewadi section the Purple line. 2020 Oct: Between PMRC Building and Dapodi 75% work completed. 2021 January: 6 Km Trial run from PCMC to Phugewadi was successful. 2022 March: 7 Km route from PCMC to Phugewadi was opened for commuters.

Which metro line is slowest in Delhi?

Green Line (Delhi Metro)

Who owns Pune Metro?

Maharashtra Metro Rail Corporation Limited (MAHA-METRO) MAHA-METRO a Special Purpose Vehicle (SPV),a 50:50 jointly owned company of Government of India and Government of Maharashtra.

Who designed Pune Metro?

Pune Metro Phase 1’s Contractors

Contract Contractor
Detailed Design Consultant for 12 elevated stations between Vanaz – Ramwadi for Line-2 LKT Engineering Consultants Ltd. & Architect Hafeez Contractor
PCMC – Range Hills (10.795 km viaduct’s construction for Line-1) NCC Ltd.